news

Two component colored pavement sanding



The integration of two-component color pavements has revolutionized the aesthetic and functional landscape of roadways, offering vibrant hues and enhanced durability. However, one persistent challenge faced by these innovative paving systems is sanding, where the surface particles, including aggregate and binder, begin to detach, leaving a granular, sandy texture. This article explores the causes of sanding in two-component color pavements, presents prevention strategies, and outlines effective repair techniques to maintain pavement integrity and appearance.


Causes of Sanding

1. Material Composition


Aggregate Quality: Low-quality aggregate particles that are not adequately bonded to the binder can easily detach.

Binder Adhesion: Insufficient binder adhesion to the aggregate can lead to particle detachment under stress.

2. Construction Defects


Compaction Issues: Poor compaction during installation can result in weak spots where aggregate particles are more likely to loosen.

Mix Proportions: Incorrect proportions of aggregate to binder can weaken the pavement structure, making it prone to sanding.

3. Environmental Factors


Freeze-Thaw Cycles: In cold climates, water penetrating the pavement can freeze and expand, weakening the bond between aggregate and binder.

Chemical Attack: Exposure to certain chemicals, such as deicing agents, can degrade the binder, reducing its adhesive properties.

4. Traffic Stress


Heavy Loads: Constant exposure to heavy vehicular traffic can exert significant stress on the pavement surface, causing aggregate particles to loosen.

Abrasive Traffic: Vehicles with studded tires or high-abrasion equipment can accelerate aggregate detachment.

Prevention Strategies

1. Material Selection and Quality Control


Aggregate Choice: Use high-quality aggregate particles that are compatible with the binder system.

Binder Quality: Ensure the binder meets specifications for adhesion and durability.

Mix Design: Optimize the aggregate-to-binder ratio to ensure strong bonding and overall pavement strength.

2. Proper Construction Techniques


Compaction: Ensure thorough compaction during installation to minimize voids and strengthen the pavement structure.

Curing: Allow sufficient time for the binder to cure and form a strong bond with the aggregate.

3. Surface Preparation and Sealing


Priming: Apply a primer to enhance binder adhesion to the substrate.

Sealants: Use protective sealants to form a barrier against water ingress and chemical attack.

4. Traffic Management


Weight Restrictions: Implement weight restrictions on pavements until they have fully cured and reached optimal strength.

Route Planning: Redirect high-abrasion traffic to minimize stress on newly installed pavements.

Repair Techniques

1. Surface Patching


Aggregate Replacement: Remove loose aggregate particles and refill the voids with compatible aggregate material.

Binder Application: Apply a new layer of binder to secure the replaced aggregate and restore surface integrity.

2. Overlay Methods


Thin Overlay: Apply a thin layer of new pavement material over the affected area to cover and protect the damaged surface.

Microsurfacing: Use a specialized microsurfacing technique to restore a smooth, even texture and improve pavement durability.

3. Structural Repairs


Full-Depth Repairs: For severely damaged areas, remove the entire damaged layer and replace it with new pavement material to restore structural integrity.

Reinforcement: In areas prone to sanding, consider reinforcing the pavement structure with additional layers or materials to enhance durability.

Conclusion

Sanding in two-component color pavements poses a significant challenge to engineers and maintenance teams, impacting both the aesthetic appeal and functional integrity of the pavements. However, through careful material selection, proper construction techniques, surface preparation, and traffic management, sanding can be effectively prevented. For pavements that do experience sanding, a range of repair techniques is available to restore surface integrity and extend pavement lifespan. Continuous monitoring, proactive maintenance, and material innovation will further contribute to the long-term performance and aesthetic value of two-component color pavements, ensuring they remain a reliable and attractive component of modern road infrastructure.


contact

Be the first to know about our new product launches, latest blog posts and more.
Chinese brand Kunjie Materials Company is an environmentally friendly enterprise that provides colored anti-skid pavement, ceramic particle anti-skid pavement, water-based polymer colored pavement, pe...

Any question or request?

Click below, we’ll be happy to assist. contact
Copyright © 2025-2028. Suzhou Kunjie Engineering Materials Co., Ltd All Rights reserved